News

30.11.2012

Latest information on the PowerNexis project

You can find the latest information and downloads .....

06.02.2013

ABS-Zulassung

Ab sofort verfügen wir über eine weitere Zulassung, die von American Bureau of Shipping (ABS). Damit ist die Firma Imbach ....

14.01.2013

Imposanter Neubau

Power Nexis – Imposante Halle für Power-Presse Mit einer Dimension von 40 x 35 x 17.5 m steht die neue Halle, eine Stahlbaukonstruktion mit Metallfassade, sehr imposant ....

10.07.2012

Groundbreaking ceremony

As you can see from the photos, the groundbreaking ceremony for the new production hall took place in glorious sunshine on July 10. The excavators and construction machinery .....

15.05.2012

Large investment in a new 3,000-tonne forging press

As part of a project going by the name POWER NEXIS, in the coming two years we will be investing a few million CHF in a new forging press and a new workshop.

22.01.2012

In der Weltspitze angekommen

Die Bobpilotin Fabienne Meyer mit den Anschieberinnen Hanne Schenk/Andrea Bitzer, die von Imbach & CIE AG gesponsert werden, haben ....

06.09.2011

Schnittwunder - Bandsäge-Automat KASTOtec AC5

Seit Februar dieses Jahres ist bei uns ein neuer Bandsägeautomat im Einsatz, für den Abmessungsbereich von rund 200 mm bis zu rund 500 mm; ein ...

28.07.2011

Investments in the finishing machines

In order to meet the increasing demands of our customers for ready-to-use, machined components, we have decided to invest in a new turning and milling centre ...

27.07.2011

Materials Advice - new service by Imbach & Co.

In July this year Dr. Tina Ventura, materials engineer ETH, started work as expert for materials and process technology in our company. Tina Ventura completed her studies in materials engineering at the ETH in Lausanne ...

09.02.2011

The old portal crane has finally come to the end of its service

In 1960 the first portal crane for the raw materials store began its duties. With this crane, steel-loads of up to ...

15.01.2011

1st. World Cup rostrum place for Bobsleigh Team Fabienne Meyer

After reaching rank 2 at the Swiss Championships, bobsleigh pilot Fabienne Meyer and her partners Hanne Schenk/Eveline Gerber, who are co-sponsored by Imbach & Co Ltd, achieved their first place ...

01.10.2010

New shine and solar energy for our new administration building

Our administration building was built at the beginning of the seventies. The energy efficiency of the roughly 40 year old building is less than optimal when judged by today’s technical standards. An examination of the building using a heat-sensitive camera ...

01.08.2010

Iron, dashingly easy

The roundabout, the design and financing of which was shared by the firm Imbach & Co Ltd, has caused quite a stir, even beyond the country’s borders.

01.07.2010

Introduction of a Production Control Centre

The firm Imbach has steadily grown over the last few years and has evolved from a traditional forge to a modern technological company. Today Imbach offers not only high quality forged parts ...

03.03.2010

Maurice E. Müller, Paul Klee, Kurt Sigrist and forge techniques from Imbach

In February 2010 the well-known artist Kurt Sigrist from Sarnen was working in our factory on a special sculpture. Special in two senses: on the one hand, the man-sized sculpture was flame-cut from a forged flat rod, a process which was directed, supervised and ...

12.02.2010

Fabienne Meyer Bobsleigh Team / Winter Olympics in Vancouver

Bobsleigh pilot Fabienne Meyer and her partner Hanne Schenk, who are co-sponsored by Imbach & Co Ltd, qualified for the Winter Olympics in Vancouver. Thanks to the silver medal won at the Swiss Championships in St. Moritz and an excellent 5th EM rank in Igls, nothing more stood in the way of selection ...